Difference between revisions of "IRC Team Meeting 2017-09-11"

From apertus wiki
Jump to: navigation, search
Line 2: Line 2:
* Bertl reported about results evaluating DDR bandwidths in the MicroZed using latest Vivado tool chain with HLx, detailed results will be released soon, we can already see now though that we can get up to 28Gigabit throughput (accounting for overhead), which has to be divided between reads and writes
* Bertl reported about results evaluating DDR bandwidths in the MicroZed using latest Vivado tool chain with HLx, detailed results will be released soon, we can already see now though that we can get up to 28Gigabit throughput (accounting for overhead), which has to be divided between reads and writes
* Team Talk 13.1 almost ready for release
* Team Talk 13.1 almost ready for release
* Update from Felix working on the AXIOM Beta SDI module, prototype.de grant period has started in september, mainly infrastructure, setup work and reading up on standards and frameworks so far.
* Update from Felix working on the AXIOM Beta SDI module, prototypefund.de grant period has started in september, mainly infrastructure, setup work and reading up on standards and frameworks so far.
* Sebastian spent quite some time on pick and place software improvements and designing and 3d printing accessory parts for the pick and place machines
* Sebastian spent quite some time on pick and place software improvements and designing and 3d printing accessory parts for the pick and place machines
* Rex reported about progress to create an AXIOM Beta Manual for the developer kit in LaTex: https://github.com/apertus-open-source-cinema/beta-documentation/tree/master/AXIOM%20Beta/ABM%20-%20AXIOM%20Beta%20User%20Guide
* Rex reported about progress to create an AXIOM Beta Manual for the developer kit in LaTex: https://github.com/apertus-open-source-cinema/beta-documentation/tree/master/AXIOM%20Beta/ABM%20-%20AXIOM%20Beta%20User%20Guide

Revision as of 19:53, 11 September 2017

  • Bertl reported about the end of the last Google Summer of Code period and completed evaluations, projects have been uploaded and archived, we will see that we can integrate the results in the near future
  • Bertl reported about results evaluating DDR bandwidths in the MicroZed using latest Vivado tool chain with HLx, detailed results will be released soon, we can already see now though that we can get up to 28Gigabit throughput (accounting for overhead), which has to be divided between reads and writes
  • Team Talk 13.1 almost ready for release
  • Update from Felix working on the AXIOM Beta SDI module, prototypefund.de grant period has started in september, mainly infrastructure, setup work and reading up on standards and frameworks so far.
  • Sebastian spent quite some time on pick and place software improvements and designing and 3d printing accessory parts for the pick and place machines
  • Rex reported about progress to create an AXIOM Beta Manual for the developer kit in LaTex: https://github.com/apertus-open-source-cinema/beta-documentation/tree/master/AXIOM%20Beta/ABM%20-%20AXIOM%20Beta%20User%20Guide
  • Intracube reported about progress of the AXIOM logo / "shot on" animation: https://drive.google.com/file/d/0Bx9E_hC7xaUabmU3OG1PbS1Xenc/view https://drive.google.com/file/d/0Bx9E_hC7xaUaWUJBRnRGek1oem8/view

Full Log: http://irc.apertus.org/index.php?day=11&month=09&year=2017#36